The Seller shall not be held responsible for delay in shipment or non-delivery of the goods due to Force Majeure, which might occur during the process of manufacturing or in the course of loading. The Seller shall advise the Buyer of the occurrence mentioned above within 15 (fifteen) days and send by airmail a certificate of the incident issued by the local government to the Buyer. Even in such cases, the Seller is still liable to take all possible measures to expedite the delivery of goods.
在貨物制造和裝運過程中,由于發生不可抗力事故致使延期交貨或不能交貨,賣方概不負責。賣方在不可抗力事件發生后,應立即通知買方并在事發14天內,將事故發生所在地當局簽發的證書航空郵寄給買方以作證據。即使在此情況下,賣方仍有責任采取必要的措施,盡快交貨。
Should the Seller fails to perform the contracted obligations 10 (ten) weeks after the aforesaid incident, the Buyer shall have the right to treat the contract as null and void.
不可抗力事故發生后超過10個星期而合同尚未履行完畢,買方有權撤銷合同。